ARBORICULTURAL_IMPACT_APPRAISAL_AND_METHOD_SATEMENT-1335971 — SGN-5-Cranes-Rigs-V3.pdf

Site Cranes and Piling Rigs (SGN 5)


Establishes:

  • Precautions to prevent damage to tree branches and trunks from cranes and piling rigs.
  • Use of banksmen and facilitation pruning to avoid contact with trees.

Weak Points:

  • Potential for human error or inadequate supervision leading to accidental damage.
  • Ensuring all operatives are properly trained and briefed on tree protection protocols.

What aspects should be evaluated in relation to this document?

ENVIRONMENTAL IMPACT


Review Equipment Use Guidelines:

Assess the guidelines for using cranes and rigs within RPAs to ensure they minimize soil compaction and root damage.

DESIGN AND APPEARANCE


Evaluate Visual Impact:

Check how the presence and operation of cranes and rigs will impact the site’s appearance during construction. Measures should be taken to minimize visual disruption.

RESIDENTIAL AMENITY


Consider Noise and Safety:

Review the impact of using heavy machinery on residents, focusing on noise levels and safety measures to mitigate any negative effects.